Kitchen is the busiest place at home. Experienced kitchen designer will assess the each kitchen project to its unique requirements. No two kitchens are alike, even if it came from form same manufacturer in same colour scheme.
The most important part of the kitchen design is "the three great C's"
- cleaning (sink area)
- cooking
- cooling (refrigerator)
This is the kitchen designers code and rest of kitchen plan works around it.
Preparation of service after removal is the key to error free kitchen install. Kitchen should have been designed, surveyed and ordered prior to this point, therefore plan must be on site to arrange plumbing and electrical service.
We always install a completely new kitchen electrical circuit to latest building regulation code to minimize potential issues with old electrics.
Walls and floor should be inspected for potential damp issues.
Prior to fitting kitchen units we advise walls to be plastered, floor tiling to be done, decorated (as it can be touched up afterwards.
Good quality hardwearing floor tiles are recommended.
Kitchen is were our master carpentry skills true shine resulting in professionally fitted kitchen.